Ease of Doing Business

Streamlining success, pioneering prosperity

The purpose of ease of doing business is to create a business-friendly environment that promotes entrepreneurship, attracts investments, and facilitates economic growth. It aims to simplify bureaucratic processes, reduce regulatory burdens, and streamline government procedures to make it easier for individuals and businesses to start, operate, and expand their ventures.

FISCAL INCENTIVES

THE REVISED INVESTMENT CODE 2025

New/Expansion
Enterprises

NON-FISCAL INCENTIVES

THE REVISED INVESTMENT CODE 2025

ELECTRICITY RATES

Residential
Low Voltage
Connected households
14.44
13.09
42,000 to 45,000

Wind Farm

Wind Turbines
MW Installed Capacity
27
54

Telecommunications

Number of Cellular Sites

Municipalities
Smart
Globe
Jordan
2
5
Buenavista
2
3
Nueva Valencia
3
2
San Lorenzo
1
3
Sibunag
1
1

Capacity

Municipalities
Smart
Globe
Jordan
2G (900 MHz, 1800MHz); 4G/LTE (700MHz, 1800MHz, 2100MHz)
2G (900 MHz); 4G/LTE (700MHz); MW
Buenavista
2G (900 MHz); 4G/LTE (700MHz, 1800MHz, 2100MHz)
2G (900 MHz); 4G/LTE (1800MHz,); MW
Nueva Valencia
2G (900MHz, 1800MHz); 4G/LTE (700MHz, 1800MHz, 2100MHz)
2G (900 MHz); MW
San Lorenzo
2G (900MHz, 1800MHz); 4G/LTE (2100MHz)
2G (900 MHz); MW
Sibunag
2G (900 MHz); 4G/LTE (700MHz, 2100MHz)
2G (900 MHz); MW

Telephone Loads

Municipalities
Loads
Jordan
282
Buenavista
437

WATER RATES AND CAPACITY

Total Capacity

Dry Season
Rainy Season
BUENAVISTA
50 Cubic Meter/Hour
99 Cubic Meter/Hour
NUEVA VALENCIA
7,000 Cubic Meter
6,335 Cubic Meter
JORDAN
45 Liter/Second
105 Liter/Second

ENERGY

Power Supplier
Plant Type
Contracted Capacity (kw)
Green Core Geothermal Inc. (GCGI)
Geothermal
2,500
Panay Energy Development Corporation (PEDC)
Coal
2,000
FDC Misamis Power Corporation
Coal
3,000
Sual Power Inc. (SPI)
Coal
1,000