Guimaras Wind Farm

Guimaras Wind Farm is a project of AC Energy that is envisioned to sustain the yearly power needs of around 42,000 households. It also aimed to reduce greenhouse gas emissions, estimated at 1.3 million tons of CO2 over a 20-year project life. The wind farm has a total of 27 Wind Turbine Generators (WTGs), across the four barangays of the municipality of San Lorenzo, Guimaras. Each wind turbine generator has a capacity of 2 MW. In 2014, it became the first wind farm to be connected to the Visayas Grid. Its generated electricity directly goes to the grid, contributing to the power needs of the whole Visayas.

Gallery

How to get there?

15 minutes to 30 minutes ferry ride from Parola Wharf to Jordan Wharf.

N/A

N/A